Carpentry 801ab
Two floors to 8×10 buildings and one wall almost done in less than 80″ of class time – fastest every. Good job lads
Carpentry 801ab
Two floors to 8×10 buildings and one wall almost done in less than 80″ of class time – fastest every. Good job lads
Carpentry 801ab
Well the lads where hard at work getting the sit ready for the construction of two 8x 10 buildings and 6 picnic tables – we are now ready to build.
Thank you lads for all your hard work yesterday – check the pics
Complete questions 1 to 14 page 40 and questions page 71 and 72, 1 to 19 also finish online assignment found on the art blog – homelessness and other online assignment post earlier. This must be completed by Wed. Feb. 15th
Drawings now working on
Diognosic drawing, see previous post
Shape drawing (Thursday Feb. 09)
Slide show of the principles (assigned Thursday Feb.09
Search the internet for new technologies in housing.
Choose one that interests you and determine the following:
1 What are the benefits (advantages) of using the technology?
2 What are some possible problems with using this technology?
3 In your opinion, is the technology likely to be used in almost all houses? Why or why not?
Art 401 The vase face drawing:
Complete the vase face drawing as per instructions and add to it as shown below. Allow yourself room for lots of imagination.